Skip to main content
result awaitedVI: Limited

RRB Group D 2026 (CEN 09/2025) — CBT Concluded, Objections Open, Result Awaited

Source: RRB CEN 09/2025 Official Notification. Last verified: 2026-09-19.

How to use this page

  • 1 to 3 — switch between the tabs
  • / arrow keys — read the next / previous section (focus follows along)
  • L — listen to the whole page
  • F follow · S share · H all shortcuts
Share on WhatsApp [S]Official source [Enter]

Use the down and up arrow keys to read this tab section by section; press 1 to 3 to switch tabs.

[1]

At a glance

RRB Group D — Level-1 posts (Pointsman, Track Maintainer, Assistant Loco Shed, Assistant Operations, Assistant TL&AC, Assistant S&T, etc.), conducted by Railway Recruitment Boards. Current stage: result awaited. RRB Group D Level-1 posts cover track and rolling-stock maintenance and operational support across Indian Railways zones — Pointsman, Track Maintainer, Assistant Loco Shed, Assistant Operations (Electrical), Assistant TL&AC, and Assistant (Signal & Telecom).

[2]

Step by step: what to do now

SCRIBE ELIGIBILITY & RULES (Extracted from Official RRB CEN 09/2025 Notification, Para 11.7): 1. Automatic Eligibility: Blindness, Locomotor Disability (both arms affected), and Cerebral Palsy get scribe facility automatically if desired. 2. Other Categories: Scribe allowed on production of a certificate that the candidate has a physical limitation to write. 3. Definition Note: Candidates with visual disability of less than 40%, or who are one-eyed, are NOT considered Visually Impaired for this purpose. 4. Non-Candidate Rule: Scribe cannot be a candidate applying under this same CEN. 5. Extra Time: 20 minutes per hour of examination, including for eligible candidates who do not use a scribe. 6. Post Suitability: Check Annexure-A before applying — only Low Vision is recognised (not Blindness), and only 7 of 14 post types are marked suitable; field/track posts have no PwBD suitability at all.

[3]

Official source and verification

Source: RRB CEN 09/2025 Official Notification. Status of these dates: official. Verified by the SuoMoto team on 2026-09-19.

Share this with another aspirant

WhatsAppTelegramFacebook